sahco - part 1 sahco - part 2 sahco - part 3 sahco - part 4
sahco - part 5 sahco - part 6 sahco - part 7 sahco - part 8
sahco - part 9 sahco - part 10 sahco - part 11 sahco - part 12

 

 
sahco - project experiences

Here are only some of our latest completed works.

No.1

Title: Modification of existing wastewater pretreament plant to cope with unflocable FOG from new products.

Description of work: Effluent's FOG is above the standard since oil that come from many new products didn't settle by current procedure. Hence,we do some experiments to find out the appropriate conditions to settle all of them. The research provide us with necessary data to do some up grading by building one more unit and installing more equipments. After the modification we can control the effluent's FOG to below standard figure.

No.2

Title: Modification of Activated Sludge (AS) from continuous stir AS to be run as sequence batch reactor AS and starting up.

Description of work: Due to the lack of proper knowledge and much change in wastewater quantity,effluent from TOA domestic wastewater treatment plant rarely meet the standard.After analyse the present problem, we solve it out by adding some equipments and alter some pipes line ,to make it become SBRAS. After that,we start up and train the factory's staff of how to operate the newly modified plant.Three months later,the effluent come to below legal standard. Finally, we offer our carefully prepared operating manual to the factory to ensure rightful operations.

No.3

Title: Making waste water treatment plant drawings for seafood frozen factory.

Description of work: The factory is going to expand production line ,so we are hired to design stabilizing pond to fit for the raised wastewater (around 2000 cmd) and prepare drawings and calculations for submitting to state officials.This piece of work was delivered to our client within 2 weeks after we recieve PO.

No.4

Title: Expanding existing wastewater treatment plant of jean dying factory by building new SBR-AS unit.

Description of work: Because factory's production increase to the extent that exceed the present capacity of WWTP to operate effectively,Phase II of construction was brought into consideration.We designed and constructed another plant which is sequence batch reactor activate sludge (SBR-AS). For setting time in each stage of one batch,we installed sophisticated equipment and electrical controlling system that is programed to be able to set aeration time, settling time and decanting time through touch screen. After we have already set time for each stage the system can be run automatically.

No.5

Title: Wastewater pretreatment of cosmetics ,detergent and soap factory

Description of work: Designing and constructing new additional sludge dewatering units

No.6

Title: Wastewater treatment of jean dying factory

Description of work: Designing and constructing structure then installing new cooling tower.

No.7

Title: Wastewater treatment of jean dying factory

Description of work: Designing and constructing of reformed holding tank.

No.8

Title: Wastewater treatment plant of paper box factory.

Description of work: Designing wastewater treatment plant.

No.9

Title: Wastewater pretreatment of cosmetics ,detergent and soap factory

Description of work: Designing and construction chemical wastewater treatment plant.Training factory's staff of how to operate.

No.10

Title: Wastewater treatment of jean dying factory

Description of work: Designing and constructing sludge belt filter press house.Installing belt filter press.

 

..........

Copyright © Sahapornprom Co., Ltd. All Rights Reserved.
Sahapornprom Co,. Ltd.
122/39 Soi Ladprao 37
Latyao Jatujak Bangkok 10900
Tel : (662) 9381705, 9381707-9 Fax : (662) 5133933
E-mail : sahco@sahco.co.th or sahapronprom@yahoo.com

 

 

 


This website is best viewed by using Internet Explorer 4.0 or later.
For a best result, please set your display at 800*600 pixels
Copyright© :: Sahapornprom Company Limited

 

sahco - home sahco - contact us